Lumix Construction Corp. is scheduled to install stormwater drainage system along NW 2nd Avenue (between Foster Road and NW 6th Street). The duration of the project is approximately five (5) working days (09/25/23 through 09/29/23).As a result, a section...
The Apollo Construction Company, LLC, will perform utility (water and sewer) connections in the public right-of-way for the Atlantic Village 4 project. The proposed work is located along NE 8th Street (between Federal Highway & NE 8th Avenue). The...